Delays at Dartford Crossing and M25 after vehicle breaks down in tunnel
Published: 11:20, 05 January 2023
Updated: 13:37, 05 January 2023
Drivers faced huge delays on the M25 after a vehicle broke down at the Dartford Crossing.
The eastbore tunnel at the crossing was closed for an hour while the stricken vehicle was recovered.
At 10.10am, National Highways said a recovery team was at the scene.
All traffic was directed to use the westbore tunnel.
As a result there were two miles of congestion on approach to the crossing on the clockwise M25.
mpu1
At around 11am, the vehicle was cleared from the carriageway and the tunnel was re-opened.
Read more!
Motorists experienced a 45-minute delay, with traffic stretching back to J3 of the M25 anti-clockwise.
All congestion in the area has now cleared.
More by this author
Cara Simmonds Post or View Comments
View on KentOnline