More on KentOnline
Severe delays are being reported after a lorry crashed into a barrier at the entrance to the Dartford Tunnel.
The west bore tunnel was shut for about an hour while repairs to the over-height barrier were carried out.
All lanes re-opened just after 3.30pm, but rush hour traffic is queuing onto the M25 following the accident.
Motorists are still advised to allow extra time for their journeys.